Pouring the floor

Pouring the floor

After all the forms have been removed from the walls it is time to pour the basement floor. In this project it is a big job as this is a huge building with more than 3,600 square feet in the foot print. Now it is time for the concrete to sit and cure. Did you know that often it takes decades for concrete to fully cure and harden?

Share this post